264.2.1.3 Rigel 288+ Electrical Safety Analyzer Figure 4.2.1.3 Rigel 288 Electrical Safety Analyzer The Rigel 288+ electrical safety analyzer offers an accurate and fast solution for meeting international and local safety standards are using standard AA batteries, tests can be carried out for insulation, earth/ground bond testing, and touch or point-to-point leakage current testing. FACULTY OF ELECTRICAL ENGINEERING (FKE) INDUSTRIAL TRAINING TECHNICAL REPORT SPECIFIC GUIDELINES FOR ALL FKE STUDENTS BEKG/BEKM (BEKU3695) & DEK (DEKU3118) Objective: One of the objectives of industrial training is to train students to prepare a technical report after completing their industrial training session. Do not sell or share my personal information, 1. This chapter also explains how Maintenance works30 prevention and repair of damage with more detailed. Develop team working spirit. Academia.edu no longer supports Internet Explorer. KPJ Johor isbacked by a comprehensive range of Specialists and Sub-specialists together with a24-hours Accident & Emergency Services and a bed capacity of 268 beds.With 40 years of experience to date, KPJ Johor excels in multiple self-developed andcollaborative Centre of Excellences in Radiotherapy & Oncology Centre, CardiacCentre, IVF Centre (Monash IVF KPJ).KPJ Johors clinical side is also backed bystate-of-the-art technologies & systems, various supporting services, and continuouslyimproved environment and facilities to provide holistic healthcare services. Other than that, I suggest tostudent for choose their internship place as close as they can with house for avoid thecosting during internship. Figure 35: Sticker application for streetlamp Error! I received my Bachelor's degree in Electrical and Computer Engineering at the . It also can add and expand technical knowledge and skills of the student, if the student has previously acquired knowledge is limited, but when students attend this training, students can find out more about things, and when something will work. maintenance works for infrastructures and public facilities, project site inspections, Do not immerse, autoclave, steam sterilize, or ultrasonically clean the monitor. In this position, I was placed in the Department ofBiomedical Services (BEMS). Benefits EST to IEC/EN62353, AAMI/IEC/EN 60601-1 & more, built-in electronic data storage, flexible user-definable test routines, battery-powered leakage, insulation & earth/ground bond tests, 50/100/250/500V DC insulation testing, automatic secondary verification ensures the correct result first time, small & compact with direct printing via bluetooth connectivity, available in a wide range of power configurations, compatible with Med-eBase for simple asset management. Currently, a minimum period of 10 weeks at industry has been made compulsory for all engineering programmes offered at the higher learning institutes. REPORT: Format of the report is according the sample format. For example, I had attended theT&C of warmer unit of ATOM at HDU ward with Ms Atirah. It is usually at operationtreatment equipment and ICU ward equipment. 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator Figure 4.2.1.4 ProSim Vital Sign and ECG Simulator Designed to get you in and out of most locations in 60 seconds, this quick-check device tests 12-lead ECG, respiration, IBP, NIBP with an easy touchscreen menu designed for troubleshooting fast. The students will be placed in government departments or private companies for 20 weeks to expose them to a real work environment and different from the atmosphere at the school. Green Keratometer at clinic Dr Asri are do PPM by Topcon. Figure 3.3.1 PPM of humidifier Ventillator Avea using Rigel analyzer 17WEEK 4 (30 MARCH 2021 3 APRIL 2021)I had attend the breakdown of Paramount patients bed at HDU. Touch the value you want to change, a keypad appears. I'm a undergraduate Electrical Engineer. Through this exposure, students will have better understanding of engineering practice in general and sense of frequent and possible problems. To browse Academia.edu and the wider internet faster and more securely, please take a few seconds toupgrade your browser. All the institutions of higher learning in Malaysia that offer Engineering programmes have this requirement in their curriculum. Throughout this exercise, students can handle a problem with wise through experience that has been through this before. Student industrial work experience scheme (SIWES) compliment students through exposure to practical aspect of their courses, having physical contact and interaction with staff and members of the general public. arranged paths, His blesses, and noble peoples He introduced along from the start to the of Engineering (Hons) Electronic Engineering (EE241) to complete eight weeks of a The students industrial works experience scheme (SIWES) programme is a manpower development geared toward acquiring to attain sustainable development, bility and higher rate of productivity in the organization. This is the report on industrial trining in DLW Varanasi. DEGEMA LOCAL GOVERNMENT COUNCIL is one of the twenty three {23} local government in rivers state, Nigeria. IN To provide speedy and efficient services for internal and external complaint issues. Figure 28 Typical connection detail of streetlamp .. Error! NSTITUTE OF ENGINEERING & TECHNOLOGY Enter the value in the numeric keypad and touch OK. Press the mainscreen key button to close the menu.Silencing alarm.To silence a continuous alarm for 60 seconds, press the alarm silence key once.For silence a continuous alarm, press alarm silence key once. A helpful LCD display and three simple buttonsmake it effortless to rapidly change parameters and view each signal output sent to thepulse oximeter immediately. The industrial training program is important for engineering students. Ledby skilled and caring medical staff, we are consistently focused on clinical excellenceand innovative technology for superior patient outcomes.Core Values Safety Courtesy Integrity Professionalism Continuous improvement 52.1.3 THE PATIENTSS RIGHT AND RESPONSIBILITYPatient's Rights1. Malaysian Engineering Accreditation Council (EAC) has stated that an undergraduate has Often students will be faced with many challenges and problems that have not been confronted. Besar of Kedah Darul Aman at that time. Tel: 607-2253000 Fax: 607-2253063 Email: [emailprotected] 92.2 ORGANIZATIONAL CHART 102.3 ORGANIZATIIONAL INFORMATION2.3.1 Biomedical Organization Structure MOHAMAD FIRZI MUKHRI BIN ALI BIOMEDICAL ENGINEERSAIDATUL AINA BINTI KHAIRUL AIMAN BIN NOOR ATIRAH BINTI MOHD YUNUS NORDIN MOHD FUDZI(BIOMED TECHNICIAN) (BIOMED TECHNICIAN) (BIOMED TECHNICIAN) BIOOMEDICAL 112.4 DEPARTMENT FUNCTION2.4.1 HEAD OF SERVICES 122.4.2 UNIT MANAGER 132.4.3 MEDICAL OFFICERS 14CHAPTER 3 SUMMARY OF INDUSTRIAL TRAINING ACTIVITIES3.1 INTRODUCTIONRun for 20 weeks training period in Biomedical Services has some exposed me to thereal working world. DLW Electrical Engineering industrial training Report. Feb 2021 - Jan 20221 year. maintenance for electrical system in MPSPK complex. To sign students log books on weekly bases. Along with my PG Diploma in Industrial Safety Management, from NAFS, Nagpur in 2019, I also passed my B. Shall keep appointments and follow up treatment.3. h) Uplifting honest, trustworthy, dedicated, and responsible for the tasks assign 21.3 THE IMPORTANCE OF INDUSTRY TRAINING. Aided, AICTE NBA Accredited. Emergency power supply system (or genset). Beside that, we had attend the PPM of tympanometer ataudiologi. Jagged Circle This comment and recommendations are also for Polytechnicstudent who get involved in this internship. You can publish your book online for free in a few minutes. Looks like youve clipped this slide to already. Discover the best professional documents and content resources in AnyFlip Document Base. In summary and comprehensive it can I explain my job overthis weekly Training Industry. g) Build confidence. Figure 30: New cable layout using cable ducting .. Error! Right to choose of care, choice of consultant and right to second opinion3. Ensuring that effective maintenance plans are in place for the maintenance of applicable equipment, that spares are available for the planned work, Key responsibilities. The Company also offers expertise in allied contracting activities such as electrical, plumbing, fire-fighting and industrial projects, in order to offer turnkey solutions, apart from execution of . The paper will provide an overview on the UTP Industrial Internship Programme focussing on its objective and approach, management of the programme, operation and monitoring of progress, assessment method and challenges in running the programme. Karaj County, Alborz Province, Iran. Enter the valuein the keypad and touch OK. After that, touch the apply button to save thechanges and the menu.Adjusting the alarm volume.Open the alarm menu and touch the alarm tone volume options. The IEEE industrial application society was founded in 2010, it is interested in advancement of theory of Electronic and electrical engineering in development, manufacturing smart . The new equipment needs to be testing by the vendor follow the IEC standardand briefing by vendor how to use their equipment. 294.6 TESTING AND COMMISSIONING (T&C)Testing and Commissioning (T&C) are the parts of installation equipment in thehospital. faculty of electrical engineering universiti teknologi mara. Do not allow liquid enter the case. The training began immediately following the completion of the semester 6 or 7 final service, site visit with their supervisor, and etcetera. Students industrial work experience scheme (SIWES) is a programme designed by the industrial training (IT) especially for the training of students in various institutions in order to acquire a commendable skill that is technically oriented and also, knowledge in relation to learning process (jemerigbo,2003) within 1993/1994 (information and guideline for SIWES, 2002) the support of the student industrial work experience scheme (SIWES) unit of the national open university of Nigeria, port-Harcourt study center. PROGRAM : EE2 41 The vendor had comeand set up the warmer unit and had do the EST (IEC 60601-1) to the warmer unit. Industrial Training Report On ELECTRICAL SUBSTATIONS AND MAINTENANCE at KPTCL, 52% found this document useful (21 votes), 52% found this document useful, Mark this document as useful, 48% found this document not useful, Mark this document as not useful, Save Industrial Training Report On ELECTRICAL SUBSTATI For Later. KPJ Johor is the first privatehospital in Johor under the KPJ Healthcare Berhad (KPJ) Group of Hospitals, thelargest network of private healthcare providers in Malaysia.KPJ Johor functions as a one-stop diagnostic and therapeutic care centre. To pause allalarms for a predetermined time interval-audio pause mode, press the alarmsilence key twice quickly. Among the biomedical engineers who have done a lotfor me are En. As an Industrial City MPSPK facility unit, and street lighting unit. compulsory industrial attachment in either government or private sector organizations. 6) All the setting will be save after changing and Exit the menu. Industrial training has been set as one of the requirements for accrediting Engineering and Technology programmes in Malaysia. INDUSTRIAL TRAINING REPORT CHUA CHONG LIANG Bachelor of Science (Hons) Quantity Surveying Lee Kong Chian Faculty of Engineering and Science Universiti Tunku Abdul Rahman December 2015. To disinfecting the monitor dampen a soft cloth with any disinfection solutions like isopropyl alcohol, hydrogen peroxide or sodium hypochlorite.Cleaning And Disinfection the Probe Well. Figure 32: Weather proof reflective sticker .. Error! This report should include different materials that are related to the project work you have selected regarding your project. In electrical division, there are two sub-division for maintenance work which includes 1.3 Administrative Division Famliy Law II - Konsep domisil dalam undang-undang keluarga dan beban bukti pertukaran domisil. Figure 3.1.1 cot side rail patients bed LKL 16WEEK 2 ( 15 MARCH 2021 19 MARCH 2021) I had attend the T&C of warmer machine ( ATOM) at HDU,vendor had set up the warmer unit and do the EST test (IEC 60601-1). The The program should therefore regard as important as to our various course of study, since it is a pivotal tool to the success and development of any nation. Bookmark not defined. Highlight of the report: The primary factor to enhance performance and productivity in any firm/organization/industry is training. INDUSTRIAL TRAINING REPORT SESSION DECEMBER 2020 NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010INDUSTRIAL TRAINING REPORT BY NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010 KPJ JOHOR SPECIALIST HOSPITAL THIS REPORT BOOK IS SUBMITTED TO ELECTRICAL ENGINEERING DEPARTMENT AS FULFILLING PART OF THE CONDITIONS AWARD DIPLOMA IN ELECTRICAL ENGINEERING (MEDICAL)POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH DECEMBER 2020 iiiiiiAKNOWLEDGEMENTSBismillahirahmanirahim, Assalamualaikum W.B.T Alhamdulillah, Praise be to Allah,Lord of the worlds. council, Maintain the 'lysaugh' public lightings placed in the regulation of the Council, Supervise and monitor the provision of electrical projects from KPKT, Investigate and resolve public complaints relating to public lightings, Check the electrical related applications from TNB. First and foremost, all praised to Allah s.w, the Creator of everything from a single drafting, computer aided drawings (CAD), practical works, public relation customer Right to appropriate grievance redress mechanism.5. Muhammad Firzi Mukhriz Bin Ali to get the sign and confirmation letter as pratical student at biomed department from Politeknik Sultan Abdul Aziz Shah. No. The conclusion that can be defined on the importance of industrial training are: a) To build and strengthen the students to be more confident to face any task and tribulations faced in the workplace. Vital sign fuse blow. The paramaount bed at 722A had panel problem, the leg side cant becontrol. Student also need to apply curiosity throughoutinternship to gain knowledge during the internship. King Fahd University of Petroleum and Minerals DEPARTMENT OF CIVIL ENGINEERING TABLE OF CONTENTS, Students Industrial Internship Programme at Universiti Teknologi PETRONAS (UTP), Malaysia. To upgrade the quality of public facilities and infrastructures for the convenience Sorting of some products that is needed to be disbatched. This exercise is also important as it can get rid of inferiority complex while a student at the Polytechnic, but when students are in training it is likely he will meet with officials of high rank or attend meetings and provide jobs to foreign workers. Students must complete 12 weeks of industrial training to be eligible to graduate. ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. About us. John Mahan, Electrical Engineering. With this The main bus 33KV is connected to grid located at Sector-25, INDIRANAGAR, LUCKNOW. AKASH This is seen as an effort to provide working exposure to students such that they will have some practical experience prior to graduation. Please ensure to check and include the following in the relevant sections of the report. MAINTENCE SER For internship students doing industrial training in Engineering Department are exposed to Limited, Bagalkot zone, Bagalkot., under the supervision of. Hopefully with the Industrial Training which able to run to enhance the knowledge of students to enable them to contribute more effectively towards national development in the future and to get a job that suits them according to the skills they have learned. "New results in linear filtering and prediction theory," Journal of Electrical Engineering, vol. Figure 29: Cable laid direct in ground laying detail . Error! f) Ability to assess themselves to prepare for the working world after graduation. Mohamad Firzi Mukhri Bin Alifor giving me the opportunity to conduct Industrial Training for 20 weeks here. Organization Background and Structure .. 1 Lastly, student needs to maintain ethics as practical student while undergoingthe internship to maintain the image of the Polytechnic. Its Headquarter are in the town Degema.it has an Area of one thousand Eleven kilo miter square and a population of about two hundred fourth nine thousand Seven hundred and seventy four. After that, vendor do the performance test to check the warmer unit function and teach user and biomed enginner how to use their warmer unit model of ATOM. e) Instill teamwork and good relationships with other employees. Industrial training for students studying at higher learning institutes has been long recognised as part and parcel of the training required prior to graduation. Do not clean electrical contacts or connectors with bleach. We had changed it with the new battery. This training is part of the learning process. Sungai Petani City 41 km/p ON name : puteri nur sofea binti mohd zakki student id : 2020995295 program : ee2 41 organization : majlis perbandaran sungai petani kedah visiting lecturer : en mohd abdul talib training duration Each student was taught how to fill and sign their log books. Personally, I would like to thank to Encik Adizul Ahmad for Figure 31: Junction box kit (manhole) . Error! Full Name. Bookmark not defined. Figure 23: Feeder pillar details front view . Error! On 28hb EEG machine have land at KPJ Johor for T&C , assist by Ms Aina and MsJuwa. The training paved way for students to develop various skills and potential and enhance productivity by adding to services provided by the organization. -1)Delivering lectures of Electrical Engineering to polytechnic students. >- Experienced in PLC (Ladder logic, Sequential Flow Chart . Figure 39: Sample of cables, cable termination and assesories Error! Moreover, Polytechnic needs to provide more initial exposure related tomedical equipment to student so that student more ready during the internship. The programme worth 16-credit hour, which is almost equivalent to a semester academic load and is, called Industrial Internship Programme. Air-conditioning units such as Air Handling Unit, AHU and Variable . by the council, Figure 5: Tuan Haji Syed Khairol Anuar bin Syed Abidin, SDK., AMK., BCK, ASK 334.7.4 Common problem of Vital Sign 4.Changing the system date and time.We need to touch the date and time panel in the lower right corner of the screendisplay. Bookmark not defined. We had change the new adapter and wait part ofthe stand from the supplier. IDS hadPPM the vital sign at the WBC and PPM ot liht minor at OT room. They will certainly do administrative works, designs, THANESH RAW A/L RAMASAMY GENISAN CONSTRUCTION AND ENGINEERING WORKS SDN.BHD LOT 10437 BATU 4 3/4, KAMPUNG JAWA, KLANG, SELANGOR, 41000 . More responsibility is placed on students with project reports than with lab reports. The industrial attachment report should follow this format. FACULTY OF ELECTRICAL ENGINEERING 31324.7.3 Basic operations of Vital Sign 4.Setting up the monitorPhilips recommends that a battery is always installed in the monitor.Connect the power cord to the power connector on the monitors rear paneland to an AC power source. Figure 3.2.1 T&C Warmer Unit machine , ATOMWEEK 3 (22 MARCH 2021 29 MARCH 2021)I had attend the PPM with Daya Cerdas for humidifier ventilallator Avea ,vendorwas checking the performance test and EST test. After that, I meet with En . I had exposed and knowingthe various of imaging medical equipment such as MRI, CT-Scan, x-ray mobile,lithotherapy equipment, physiotherapy equipment, ICU and A&E departmentequipment. 2 . c) To expose students to the real working environment. It is hoped that these properties will be sustained in the future. I am passionate about engineering, research, entrepreneurship and using my skills to solve challenges faced on the African continent. In every phase of the project, hissupervision and guidance shaped this report to be completed perfectly.I would like to express my gratitude & respect to my Academic Supervisor Dr.Baharuddin bin Mustapha did not forget the encouragement and guidance given duringthe training period. Management department, Town Planning department, Treasury department, Secretariat By then, the KPJ Group was the largesthealthcare service provider listed on the Bursa Malaysia.Johor Corp is a Malaysian state-owned investment company, is weighing strategicoptions for health-care provider KPJ Healthcare Bhd., according to people withknowledge of the matter.The investment arm of the Johor state government is seeking ideas from potentialadvisers, said the people. Bookmark not defined. En Firzi as the Biomed Engineer had give the explanation about the Biomedical Trainee Manual to me. GUIDELINES. Students Karnataka Power Transmission Corporation Limited, Bagalkot Zone, Submitted in partial fulfillment of the requirements for the degree of. The electrosurgical have error alarm the CEMalarm and the red light are turn ON, the electrosurgical had be send to vendor to berepair. Figure 41: 13A socket outlet and switches 35 To ensure the utilization of buildings are according to the stated conditions. Tech in Electrical Engineering in the year 2018 from Kalinga Institute of Industrial Training, Bhubaneswar, and completed Diploma in Electrical Engineering in the year 2015 from Jnan Chandra Ghosh Polytechnic College, Kolkata. 25811976 Industrial Training Report. Health department, Landscape and Recreational department, Asset Valuation and Property Ensure that AC outlet is properly grounded andsupplies the specified voltage and frequency (100-240VAC, 50-60 Hz). 1 Engineering Departments I would like to express my gratitude &respect to head of Electrical Engineering Biomedical Engineering MaintenanceServices (BEMS) KPJ Johor Specialist Hospital, En. Figure 3.14.1 EPOC machine.WEEK 15 ( 14 JUNE 2021 19 JUNE 2021)Voltage stabilizer MRI are problem, chargeman and CPSM had check the voltagestabilizer using the multimeter. Red JAUNPUR, UTTAR PRADESH They have spent the last two years in gaining theoretical knowledge of various manufacturing and assembly processes. b) Planting teamwork and good relations between workers and employees of an organization. I have 8.5years experience in Teaching an Electrical Engineering in Government Aided College in Punjab (India). prepared and get the necessary information/knowledge to complete the course. Bookmark not defined. Industrial training in the field of engineering is an integral part of the curriculum as it is considered to be the first job experience for a 'would-be professional.' As a trainee of the company, there is a lot of learning involved where students get a hands-on approach in work life. Figure 3.16.1 site visit for Linac replacementWEEK 17 ( 28 JUNE 2021 - 3 JULY 2021)Fridge medication at treatment room are high temperature, Mr Aiman had checkingthe temperature value of medication fridge and wait for vendor Bayna to troubleshootit. 35The parameter of NBP module.Parameter SpecificationSystolicDiastolic 30mmHg - 270mmHg (4.0kPa-36.0kPa)MAP 10mmHg 245mmHg (1.3kPa-32.7kPa)Pulse Rate range 20mmHg-255mmHg (2.7kPa-34.0kPa)Blood pressure 30bpm 300 bpmaccuracyPulse rate accuracy Accuracy: 2% from 70% -100%Initial Cuff Inflation Maximum standard deviation L 8mmHgTemperature Maximum mean error: bpmspecifications 40bpm - 100 bpm: 5bpm 101bpm - 200bpm: 5% of reading 201bpm 300bpm: 10% of reading Adult: 160mmHg (21.3kPa) Pediatric: 140mmHg (18.7kPa) Neonatal: 100mmHg (13.3kPa) Monitored mode measurement: 26.7 - 43.3 Predictive mode measurement: 34.4 - 40.6 Accuracy: 0.1 364.7.6 Breakdown Vital Sign 4. 37CHAPTER 5 FINDINGS AND RECOMMENDATIONS5.1 FINDINGS Alhamdulillah, Praise to Allah for giving me this opportunity to gainknowledge and experience as a biomed technician at KPJ Johor Specialist Hospital.